PRODUCTS
RESURFACING SYSTEMS
STANDARD SYSTEMS
- 6500 Series Light Duty Resurfacer
- 7000 Series Industrial Floor Resurfacer
- 7500 Series Industrial Floor Resurfacer
HIGH-TRAFFIC SYSTEM
- 7600 Series High Traffic Resurfacer
- 9000 Series Super Alloy Topping
- 10,000 Series Flooring System (10K)
CORROSION PROTECTIVE SYSTEMS
- 7800 Series Chemical Resistant Resurfacer
- 8000 Series Chemical Resistant Resurfacer
- NV-4000 Series Vinyl Ester Resurfacer
DECORATIVE FLOORING SYSTEMS
- 1000 Series Resurfacer
- 1100 Series Resurfacer
- 1200 Series Resurfacer
- 1700 Series Resurfacer
- 2000 Series Resurfacer
- 2100 Series Resurfacer
URETHANE SYSTEMS
- Urethane Mortar System
- Urethane Slurry System
STANDARD COATINGS
- 105 Chemical Resistant Urethane
- 110 Polyaspartic Urethane
- 350 Clear Epoxy Coating
- 351 Pigmented Epoxy Coating
SPECIALTY COATINGS
- 850 Clear Epoxy Novolac Coating
- 851 Pigmented Epoxy Novolac Coating
- 901 Abrasion Resistant Coating
- ESD Coating
CLEANING INSTRUCTIONS
- Do not clean new floors until fully cured at 70º F for 7 days. Exposure to water and or cleaning solutions prior to final cure may alter the color and appearance of the newly installed flooring. Do not use harsh chemicals to clean flooring. Detergents or soaps should be tried first in a non-obvious place before cleaning the entire floor. If a mechanical scrubber is to be used, make sure is is equipped with soft white brushes.
COLOR SELECTION
- Niser Standard Color Chart
- Niser Standard Color Quartz Chart
- Custom Quartz Blend Selector
- Flexible Epoxy Joint Filler
- Epoxy Crack Filler
- Cove Base Mortar
ACCESSORIES
- Niser General Purpose Epoxy Primer
- Traffic Lines and Logos
- Flexible Epoxy Membrane
- Flexible Epoxy Joint Filler
- Epoxy Crack Filler
- Cove Base Mortar
CONCRETE REQUIREMENTS
- No Calcium
- No Air
- Must have vapor barrier in direct contact with bottom of slab
- Steel Trowel Finish
- Water Cure Concrete
- All surfaces to be coated are to be cleaned free form dirt, oil, grease, curing compounds, surface sealers of foreign laitance that may prohibit proper bond adhesion. Substrate should be dry prior to preparation work. Concrete must be roughened with any loose or unsound material completely removed before installing epoxy coating. Shot blasting is the preferred method of preparation.